USA: 440-942-9118   CA: 905-333-0300   |   Français / Español

Fast Lead Times

Hadrian -  Fast Lead Times
New Lead Times - Now Faster than Ever!
All lead times below are Hadrian's manufacturing lead times and do not include for transit and distributor scheduling requirements.
  • 30 unit maximum for quick ship toilet partition orders.
  • Daily order cut-offs for quick ship programs and weekly order cut-offs for standard shipping programs (and the locker express program) apply at 12:30 pm (click here for time zone details).
  • Quick Ship Programs
  • Standard Shipping Programs
USA Premium Quick Ship Subject to upcharge
New Program
1 Business Day Metal Toilet Partitions: Headrail braced
Powder Coated Finishes:
  • 504 Linen
  • 535 Light Grey
  • 603 Almond
Stainless Steel Finishes:
  • #4 Brushed Stainless Steel
  • Embossed Stainless Steel
USA Quick Ship
New Expanded Program
2 Business Days Metal Toilet Partitions: Headrail braced
5 Business Days Metal Toilet Partitions: Ceiling Hung (for 9 ft ceilings and lower) and Floor Mounted Solid Plastic Toilet Partitions: All mounting options and colors (plastic channels excluded)
Powder Coated Finishes:
  • 504 Linen
  • 510 Black
  • 532 Latte
  • 535 Light Grey
  • 545 Charcoal
  • 585 Sahara
  • 603 Almond
  • 607 Bordeaux
  • 609 Colonial Blue
  • 621 Slate
  • 828 Dovetail
  • 814 Cast Iron
Stainless Steel Finishes:
  • #4 Brushed Stainless Steel
  • Embossed Stainless Steel
CANADA Quick Ship Program
3 Business Days Metal Toilet Partitions: Headrail braced
Powder Coated Finishes:
  • 535 Light Grey
USA & CANADA Locker Express Program (LEP)
3.5 Weeks From Thursday cut-off
  • Emperor (corridor) lockers
  • Single or double tier
  • 12" wide X 12", 15" or 18" deep X 72" high
  • 1-100 units
  • Common accessories are available to match frame color
  • Doors and frames are available in matching or different colors
  • Friction catch padlock preparation or built-in lock preparation (delivery of combination locks may take 3-4 weeks)
Metal Toilet Partitions USA & Canada
Improved Program
2.5 Weeks From Thursday Cut-off
  • All metal finishes*
  • All series & mounting options
  • All privacy options

*3.5 weeks, or greater, for hybrid stainless steel, custom colors and special production items

Solid Plastic Toilet Partitions USA & Canada
2.5 Weeks From Thursday Cut-off
  • All solid plastic colors
  • All mounting & hardware options
  • 30 units or more
Lockers USA & Canada
Lead time from Thursday Cut-off
  • Emperor (Corridor) Lockers: 5.5 weeks
  • Gladiator (Athletic) Lockers: 5.5 weeks
  • Replacement Front Lockers: 5.5 weeks
  • Open Front Lockers: 7.5 weeks
  • Divided Lockers: 7.5 weeks
Order Cut-Off Details

Daily order cut-offs for quick ship programs and weekly order cut-offs for standard shipping programs (and the locker express program) apply at 12:30PM.

Canada: Order cut-offs are 12:30PM Eastern.
USA: Order cut-offs for states shown in green are 12:30PM Pacific. Order cut-offs for states shown in blue are 12:30PM Eastern.